Sheeting nearly done.
Tyvek wrap going on. 
Did I mention that it rained alot? 
Ridge beam going up. 
Starting rafters. 
Did I mention the rain? 
Between rain storms we removed the tarp and worked until it rained again.  
Working on the shingles.  On the back side I had one memorable day when I laid down the same chalk lines 6 times between rain showers until I finally gave up for the day. 
Door and window installed. 
Temporary garage door in and stucco wire on.  
Due to rainy season Stucco contractors fell way behind.  Called around 8 all of whom said they couldn't possibly squeeze me in.  So I learned how to Stucco and rented a stucco mixer.  
Over 2 tons of concrete were mixed and carried by hand and placed on the building.  
The next challenge was getting electricity into the shop.  I hired a contractor who started to dig the trench and then kept putting me off as to when he would return.  Finally got fed up, and finished the job myself.
 
The ground was clay and with the standing water from the rain it filled up faster than I could pump it out.  Each shovel full stuck to the shovel making it a slow wet process.  
Finally got to the point of installing the conduit.