12/09/06 Final Updates A few pictures of the completed vehicle (Ok still some stencils and small bits to put on, but it's licensed and on the road) see chassis page 6.
17/08/06 More pictures of work in progress on chassis page 6.
15/08/06 More pictures of work in progress on chassis page 5 and chassis page 6
09/08/06 Engine back, installed and runs great. Many new pictures on chassis page 5.
05/07/06 Still waiting for engine parts but doing some other work in the mean time. Windshield repaired and mounted as well as the axe head bracket. Only two pictures on chassis page 5.
08/06/06 Finally got around to updating the site. I have change the way page navigation works with a simpler Prev Home Next method as it is easier to update pages without having to change a lot of links. have also changed the menu image to a better version. New info on the rebuild is on chaiss and rebuild pages 4 and 5.
23/03/06 Finally got some more updates done. Added info on my 19 set install on the electrical page 2 and more re-assembly on the chassis pages. I really should rename it rebuild, however that would require redoing to many pages.
01/01/06 HAPPY NEW YEAR!!! Added a number of new photo's on chassis three page and an entire article on a trip I took to Midwest Military.
02/11/05 updates on page 1 of the electrical section. Completed gauges and installed them. Completed the convoy light and installed it. On the chassis 3 page show before and after of underside of floor and hat channels.
24/10/05 Lots of updates. More photo's on the chassis 2&3 pages and have started entries in the electrical pages. A lot of little parts are getting put on the tub that are too numerous to document with photo's. Still have some major work to do on the front end, but am awaiting brake parts. Have redone the instrument panel and the switch plates.
10/10/05 Added some new brakes lines and put the tub on the chassis. See the chassis and rebuild page 2.
26/09/05 New pictures of the brakes installed on the chassis and rebuild page 2.
20/09/05 Added photo's of front axle installed and spring shackles
08/09/05 RED letter day today!!! Started adding parts instead of removing.
07/09/05 Chassis page 2 - painted chassis and axle. Changed this page to resize older entries.
05/09/05 Finally got some time to work on the jeep and update this site. Added a new section called chassis & rebuild. Added a page 1 which shows the completion of the strip out and the beginnings of the rebuild.
12/07/05 Changed the order of these updates so the newest is first and bold faced type. No more scrolling to the bottom. Added a few more pictures of sandblasted parts to body work page 6.
05/07/05 Fixed link to trailers page.
25/06/05 Haven't updated in a while as I am busy on some other projects at the moment. A small update to show off my new sandblast cabinet. See Tools and Jigs and Body work page six for some photos.
28/05/05 Shot second coat of primer and first two coats of colour. Changed the "paint" link to "chassis and rebuild".
27/05/05 Added new page 6 to bodywork section with a picture of the TUB painted with primer.
25/05/05 Resorted some pages. Added progress pictures to bodywork 5 page. The Tub is almost ready for paint.
22/05/05 Added a video to Bodywork page 5.
14/05/05 Pictures of the installed hat channel and of the finished patch.
12/05/05 Added navigation bars to the bottom of the Body work pages. Added pictures of repaired hat channel to Body Work page 5.
11/05/08 Redid page navigation bars to include a link to a page on Tools and Jigs that I used to build the jeep. I put some more pictures of my rottisserie on the page. Added some more pictures to the last body work page # 4.
08/05/05 Finished the floor. Made some minor dent repairs and started the repair of the right rear quarter panel.
07/05/05 Added page 4 to Body work section and added navigation links to previous pages. Updated all previous listed Updates to reflect proper dates (confused April with May).
27/04/05 Continued repairing the floor on the body work pages. I am caught up with the past photos and from here on all photo's will show recent work.
26/04/05 Added more to Body Work section. One more update and I should be caught up to the actual work in progress.
25/04/05 Added more to Body Work Section
24/04/05 Added section on Body Work.
19/04/05 Added more to the tear down pages, including a link to some pages which show building my workshop.
15/04/05 - Completely revised old page. Added pictures to tear down. Added page for trailers.